{"id":71399,"date":"2021-10-11T21:39:53","date_gmt":"2021-10-11T19:39:53","guid":{"rendered":"https:\/\/www.csregypt.com\/?p=71399"},"modified":"2021-10-11T21:39:53","modified_gmt":"2021-10-11T19:39:53","slug":"exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022","status":"publish","type":"post","link":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/","title":{"rendered":"ExxonMobil&#8217;s 1st large-scale plastic recycling facility to operate by end of 2022"},"content":{"rendered":"<p dir=\"ltr\" style=\"text-align: left;\"><a href=\"https:\/\/www.csregypt.com\/en\/exxonmobil-porsche-join-forces-to-test-lower-carbon-efuel\/\">ExxonMobil<\/a> plans to build its first, large-scale plastic waste advanced recycling facility in Baytown, Texas, and is expected to start operations by year-end 2022.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">By recycling plastic waste back into raw materials that can be used to make plastic and other valuable products, the technology could help address the challenge of plastic waste in the environment. A smaller, temporary facility, is already operational and producing commercial volumes of certified circular polymers that will be marketed by the end of this year to meet growing demand.<\/p>\n<p>\u201cWe\u2019ve proven our proprietary advanced recycling technology in Baytown, and we\u2019re scaling up operations to supply certified circular polymers by year-end,\u201d said Karen McKee, president of ExxonMobil Chemical Company. \u201cAvailability of reliable advanced recycling capacity will play an important role in helping address plastic waste in the environment, and we are evaluating wide-scale deployment in other locations around the world.\u201d<\/p>\n<p>The new facility follows validation of ExxonMobil\u2019s initial trial of its proprietary process for converting plastic waste into raw materials. To date, the trial has successfully recycled more than 1,000 metric tons of plastic waste, the equivalent of 200 million grocery bags, and has demonstrated the capability of processing 50 metric tons per day.<\/p>\n<p>Upon completion of the large-scale facility, the operation in Baytown will be among North America\u2019s largest plastic waste recycling facilities and will have an initial planned capacity to recycle 30,000 metric tons of plastic waste per year. Operational capacity could be expanded quickly if effective policy and regulations that recognize the lifecycle benefits of advanced recycling are implemented for residential and industrial plastic waste collection and sorting systems.<\/p>\n<p>ExxonMobil is developing plans to build approximately 500,000 metric tons of advanced recycling capacity globally over the next five years. In Europe, the company is collaborating with Plastic Energy on an advanced recycling plant in Notre Dame de Gravenchon, France, which is expected to process 25,000 metric tons of plastic waste per year when it starts up in 2023, with the potential for further expansion to 33,000 metric tons of annual capacity.<\/p>\n<p>The company is also assessing sites in the Netherlands, the US Gulf Coast, Canada, and Singapore.<\/p>\n<p>To meet customer demand for circular polymers, ExxonMobil has obtained certifications through the <a href=\"https:\/\/www.iscc-system.org\/\">International Sustainability and Carbon Certification Plus<\/a> (ISCC Plus) process for several of its facilities. ISCC Plus is widely recognized by industry as an effective system to certify products that result from advanced recycling using mass balance attribution of plastic waste.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">To help address the need for increased collection and sorting of plastic waste, ExxonMobil formed a joint venture with Agilyx Corporation, Cyclyx International LLC, focused on developing innovative solutions for aggregating and pre-processing large volumes of plastic waste that can be converted into feedstocks for valuable products. Cyclyx will help supply ExxonMobil\u2019s advanced recycling projects, and will aim to do the same for other customers.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">\n","protected":false},"excerpt":{"rendered":"<p>ExxonMobil plans to build its first, large-scale plastic waste advanced recycling facility in Baytown, Texas, and is expected to start operations by year-end 2022. By recycling plastic waste back into raw materials that can be used to make plastic and other valuable products, the technology could help address the challenge of plastic waste in the [&hellip;]<\/p>\n","protected":false},"author":410,"featured_media":71400,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6038,984],"tags":[6391,11445],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>ExxonMobil&#039;s 1st large-scale plastic recycling facility to operate by end of 2022 - Csr Egypt<\/title>\n<meta name=\"description\" content=\"ExxonMobil plans to build its first, large-scale plastic waste advanced recycling facility in Baytown, Texas, and is expected to start operations by year-end 2022\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ExxonMobil&#039;s 1st large-scale plastic recycling facility to operate by end of 2022 - Csr Egypt\" \/>\n<meta property=\"og:description\" content=\"ExxonMobil plans to build its first, large-scale plastic waste advanced recycling facility in Baytown, Texas, and is expected to start operations by year-end 2022\" \/>\n<meta property=\"og:url\" content=\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/\" \/>\n<meta property=\"og:site_name\" content=\"Csr Egypt\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/csregypt\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-11T19:39:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"830\" \/>\n\t<meta property=\"og:image:height\" content=\"467\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Marwa Zein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@egyptcsrforum\" \/>\n<meta name=\"twitter:site\" content=\"@egyptcsrforum\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marwa Zein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/\"},\"author\":{\"name\":\"Marwa Zein\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec\"},\"headline\":\"ExxonMobil&#8217;s 1st large-scale plastic recycling facility to operate by end of 2022\",\"datePublished\":\"2021-10-11T19:39:53+00:00\",\"dateModified\":\"2021-10-11T19:39:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/\"},\"wordCount\":481,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/csregypt.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg\",\"keywords\":[\"#ExxonMobil\",\"plastic facility\"],\"articleSection\":[\"contribute to solution\",\"news\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/\",\"url\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/\",\"name\":\"ExxonMobil's 1st large-scale plastic recycling facility to operate by end of 2022 - Csr Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/csregypt.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg\",\"datePublished\":\"2021-10-11T19:39:53+00:00\",\"dateModified\":\"2021-10-11T19:39:53+00:00\",\"description\":\"ExxonMobil plans to build its first, large-scale plastic waste advanced recycling facility in Baytown, Texas, and is expected to start operations by year-end 2022\",\"breadcrumb\":{\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#primaryimage\",\"url\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg\",\"contentUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg\",\"width\":830,\"height\":467,\"caption\":\"ExxonMobil's 1st large-scale plastic recycling facility to operate by end of 2022\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/csregypt.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ExxonMobil&#8217;s 1st large-scale plastic recycling facility to operate by end of 2022\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/csregypt.com\/#website\",\"url\":\"https:\/\/csregypt.com\/\",\"name\":\"\u0633\u064a \u0625\u0633 \u0622\u0631 \u0645\u0635\u0631\",\"description\":\"The first portal for CSR in Egypt and Middle East\",\"publisher\":{\"@id\":\"https:\/\/csregypt.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/csregypt.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/csregypt.com\/#organization\",\"name\":\"CSR\",\"url\":\"https:\/\/csregypt.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png\",\"contentUrl\":\"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png\",\"width\":1080,\"height\":1080,\"caption\":\"CSR\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/csregypt\/\",\"https:\/\/x.com\/egyptcsrforum\",\"https:\/\/www.instagram.com\/csr.egypt\/\",\"https:\/\/www.linkedin.com\/in\/csr-egypt-43381ab5\/\",\"https:\/\/www.pinterest.com.au\/csregypt\/\",\"https:\/\/www.youtube.com\/channel\/UCh21PZpnBj2yjj2PeclXz1g\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec\",\"name\":\"Marwa Zein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g\",\"caption\":\"Marwa Zein\"},\"sameAs\":[\"http:\/\/marwazein1982@gmail.com\"],\"url\":\"https:\/\/csregypt.com\/en\/author\/marwa-zein\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ExxonMobil's 1st large-scale plastic recycling facility to operate by end of 2022 - Csr Egypt","description":"ExxonMobil plans to build its first, large-scale plastic waste advanced recycling facility in Baytown, Texas, and is expected to start operations by year-end 2022","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/","og_locale":"en_US","og_type":"article","og_title":"ExxonMobil's 1st large-scale plastic recycling facility to operate by end of 2022 - Csr Egypt","og_description":"ExxonMobil plans to build its first, large-scale plastic waste advanced recycling facility in Baytown, Texas, and is expected to start operations by year-end 2022","og_url":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/","og_site_name":"Csr Egypt","article_publisher":"https:\/\/www.facebook.com\/csregypt\/","article_published_time":"2021-10-11T19:39:53+00:00","og_image":[{"width":830,"height":467,"url":"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg","type":"image\/jpeg"}],"author":"Marwa Zein","twitter_card":"summary_large_image","twitter_creator":"@egyptcsrforum","twitter_site":"@egyptcsrforum","twitter_misc":{"Written by":"Marwa Zein","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#article","isPartOf":{"@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/"},"author":{"name":"Marwa Zein","@id":"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec"},"headline":"ExxonMobil&#8217;s 1st large-scale plastic recycling facility to operate by end of 2022","datePublished":"2021-10-11T19:39:53+00:00","dateModified":"2021-10-11T19:39:53+00:00","mainEntityOfPage":{"@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/"},"wordCount":481,"commentCount":0,"publisher":{"@id":"https:\/\/csregypt.com\/#organization"},"image":{"@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#primaryimage"},"thumbnailUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg","keywords":["#ExxonMobil","plastic facility"],"articleSection":["contribute to solution","news"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/","url":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/","name":"ExxonMobil's 1st large-scale plastic recycling facility to operate by end of 2022 - Csr Egypt","isPartOf":{"@id":"https:\/\/csregypt.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#primaryimage"},"image":{"@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#primaryimage"},"thumbnailUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg","datePublished":"2021-10-11T19:39:53+00:00","dateModified":"2021-10-11T19:39:53+00:00","description":"ExxonMobil plans to build its first, large-scale plastic waste advanced recycling facility in Baytown, Texas, and is expected to start operations by year-end 2022","breadcrumb":{"@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#primaryimage","url":"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg","contentUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg","width":830,"height":467,"caption":"ExxonMobil's 1st large-scale plastic recycling facility to operate by end of 2022"},{"@type":"BreadcrumbList","@id":"https:\/\/csregypt.com\/en\/exxonmobils-1st-large-scale-plastic-recycling-facility-to-operate-by-end-of-2022\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/csregypt.com\/"},{"@type":"ListItem","position":2,"name":"ExxonMobil&#8217;s 1st large-scale plastic recycling facility to operate by end of 2022"}]},{"@type":"WebSite","@id":"https:\/\/csregypt.com\/#website","url":"https:\/\/csregypt.com\/","name":"\u0633\u064a \u0625\u0633 \u0622\u0631 \u0645\u0635\u0631","description":"The first portal for CSR in Egypt and Middle East","publisher":{"@id":"https:\/\/csregypt.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/csregypt.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/csregypt.com\/#organization","name":"CSR","url":"https:\/\/csregypt.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png","contentUrl":"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png","width":1080,"height":1080,"caption":"CSR"},"image":{"@id":"https:\/\/csregypt.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/csregypt\/","https:\/\/x.com\/egyptcsrforum","https:\/\/www.instagram.com\/csr.egypt\/","https:\/\/www.linkedin.com\/in\/csr-egypt-43381ab5\/","https:\/\/www.pinterest.com.au\/csregypt\/","https:\/\/www.youtube.com\/channel\/UCh21PZpnBj2yjj2PeclXz1g"]},{"@type":"Person","@id":"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec","name":"Marwa Zein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g","caption":"Marwa Zein"},"sameAs":["http:\/\/marwazein1982@gmail.com"],"url":"https:\/\/csregypt.com\/en\/author\/marwa-zein\/"}]}},"jetpack_featured_media_url":"https:\/\/csregypt.com\/wp-content\/uploads\/2021\/10\/62WBD2NYCCKOMOK6XQ75JU7EC4.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/71399"}],"collection":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/users\/410"}],"replies":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/comments?post=71399"}],"version-history":[{"count":1,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/71399\/revisions"}],"predecessor-version":[{"id":71402,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/71399\/revisions\/71402"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/media\/71400"}],"wp:attachment":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/media?parent=71399"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/categories?post=71399"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/tags?post=71399"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}