{"id":53375,"date":"2020-03-16T09:56:23","date_gmt":"2020-03-16T07:56:23","guid":{"rendered":"https:\/\/www.csregypt.com\/?p=53375"},"modified":"2020-03-16T09:56:23","modified_gmt":"2020-03-16T07:56:23","slug":"33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage","status":"publish","type":"post","link":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/","title":{"rendered":"$33 m AfDB clean water project in Zimbabwe in final stage"},"content":{"rendered":"<p style=\"direction: ltr;\">A $ 33-million clean water and sanitation project in Zimbabwe will be finalized by the third quarter of 2020. The African Development Bank (AfDB)-funded project started in 2015 with an aim get around 9,000 homes in vulnerable communities in Bulawayo to have access to clean water.<\/p>\n<p style=\"direction: ltr;\">The Bulawayo Water and Sewerage Services Improvement Project (BWSSIP) is on course to rehabilitate and upgrade water production treatment facilities, water distribution, sewer drainage networks and wastewater treatment disposal facilities in the southwestern part of the city.<\/p>\n<p style=\"direction: ltr;\">\u00a0\u201cWe are counting down months to completion. With the full suite of new services, we seek to reverse the devastating effects that poor sanitation and water supply has brought to this area. We look forward to witnessing the positive impacts that these changes will bring and building the resilience of this society,\u201d said Mr Damoni Kitabire, Country Manager for the Bank\u2019s Zimbabwe office.<\/p>\n<p style=\"direction: ltr;\">Bulawayo, like many urban centers in Zimbabwe, has been affected by years of under-investment in its water and sewerage infrastructure maintenance.<\/p>\n<p style=\"direction: ltr;\">The city also suffers from water insecurity due to frequent drought. Less than 50% of the sewage generated in the city is currently collected, and the exposure to contamination is significant.<\/p>\n<p style=\"direction: ltr;\">The project, administered by the government of Zimbabwe via the Bulawayo City Council, is designed to contribute to the health and social wellbeing of its population.<\/p>\n<p style=\"direction: ltr;\">\u201cBefore the project, water was distributed on a ration basis, forcing marginal communities in Cowdray Park, an informal settlement in Bulawayo District to walk for over a kilometer to get water,\u201d said Engineer Simela Dube, Director Engineering Services for the Bulawayo City Council.<\/p>\n<p style=\"direction: ltr;\">Since the project\u2019s inception in 2015, four pumps have been replaced and 141 kilometers of network in Magwegwe and Criterion reservoir areas rehabilitated. Similarly, water mains have been upgraded, renewed and in some cases, replaced. Environmental improvements include rehabilitating two wastewater treatment facilities and replacing 18 kilometers of sewer lines.<\/p>\n<p style=\"direction: ltr;\">In addition, nearly 2,000 municipal staff have been trained (30% of them women) to address the lack of skills to efficiently manage water and sewer service delivery systems, and several interns afforded an opportunity to hone new skills through engagement on various segments of the project.\u00a0 Training was provided on the environment, water services, gender and health.<\/p>\n<p style=\"direction: ltr;\">Supporting the rehabilitation of water and sanitation in Zimbabwe has been one of the bank\u2019s priority areas since a cholera epidemic in 2008\/09.\u00a0 The BWSSIP is an extension of the bank\u2019s efforts to stabilize and improve water supply and sanitation services in Zimbabwe.<\/p>\n<p style=\"direction: ltr;\">Without adequate financing, the city was suffering from inadequate and dilapidated water and sanitation infrastructure, including inefficient and old pumps and treatment works; non-functional sewer systems and frequent instances of contaminated pipe water.<\/p>\n<p style=\"direction: ltr;\">\n","protected":false},"excerpt":{"rendered":"<p>A $ 33-million clean water and sanitation project in Zimbabwe will be finalized by the third quarter of 2020. The African Development Bank (AfDB)-funded project started in 2015 with an aim get around 9,000 homes in vulnerable communities in Bulawayo to have access to clean water. The Bulawayo Water and Sewerage Services Improvement Project (BWSSIP) [&hellip;]<\/p>\n","protected":false},"author":410,"featured_media":53376,"comment_status":"open","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[984,6030],"tags":[7822,7884,8563,6984],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>$33 m AfDB clean water project in Zimbabwe in final stage - Csr Egypt<\/title>\n<meta name=\"description\" content=\"A $ 33-million clean water and sanitation project in Zimbabwe will be finalized by the third quarter of 2020 to serve around 9,000 homes\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"$33 m AfDB clean water project in Zimbabwe in final stage - Csr Egypt\" \/>\n<meta property=\"og:description\" content=\"A $ 33-million clean water and sanitation project in Zimbabwe will be finalized by the third quarter of 2020 to serve around 9,000 homes\" \/>\n<meta property=\"og:url\" content=\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/\" \/>\n<meta property=\"og:site_name\" content=\"Csr Egypt\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/csregypt\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-16T07:56:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"856\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Marwa Zein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@egyptcsrforum\" \/>\n<meta name=\"twitter:site\" content=\"@egyptcsrforum\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marwa Zein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/\"},\"author\":{\"name\":\"Marwa Zein\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec\"},\"headline\":\"$33 m AfDB clean water project in Zimbabwe in final stage\",\"datePublished\":\"2020-03-16T07:56:23+00:00\",\"dateModified\":\"2020-03-16T07:56:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/\"},\"wordCount\":454,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/csregypt.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg\",\"keywords\":[\"#Clean Water\",\"#Zimbabwe\",\"AfDB\",\"SDGs\"],\"articleSection\":[\"news\",\"Sustainable Development\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/\",\"url\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/\",\"name\":\"$33 m AfDB clean water project in Zimbabwe in final stage - Csr Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/csregypt.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg\",\"datePublished\":\"2020-03-16T07:56:23+00:00\",\"dateModified\":\"2020-03-16T07:56:23+00:00\",\"description\":\"A $ 33-million clean water and sanitation project in Zimbabwe will be finalized by the third quarter of 2020 to serve around 9,000 homes\",\"breadcrumb\":{\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#primaryimage\",\"url\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg\",\"contentUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg\",\"width\":1200,\"height\":856,\"caption\":\"$33 m AfDB clean water project in Zimbabwe in final stage\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/csregypt.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"$33 m AfDB clean water project in Zimbabwe in final stage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/csregypt.com\/#website\",\"url\":\"https:\/\/csregypt.com\/\",\"name\":\"\u0633\u064a \u0625\u0633 \u0622\u0631 \u0645\u0635\u0631\",\"description\":\"The first portal for CSR in Egypt and Middle East\",\"publisher\":{\"@id\":\"https:\/\/csregypt.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/csregypt.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/csregypt.com\/#organization\",\"name\":\"CSR\",\"url\":\"https:\/\/csregypt.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png\",\"contentUrl\":\"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png\",\"width\":1080,\"height\":1080,\"caption\":\"CSR\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/csregypt\/\",\"https:\/\/x.com\/egyptcsrforum\",\"https:\/\/www.instagram.com\/csr.egypt\/\",\"https:\/\/www.linkedin.com\/in\/csr-egypt-43381ab5\/\",\"https:\/\/www.pinterest.com.au\/csregypt\/\",\"https:\/\/www.youtube.com\/channel\/UCh21PZpnBj2yjj2PeclXz1g\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec\",\"name\":\"Marwa Zein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g\",\"caption\":\"Marwa Zein\"},\"sameAs\":[\"http:\/\/marwazein1982@gmail.com\"],\"url\":\"https:\/\/csregypt.com\/en\/author\/marwa-zein\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"$33 m AfDB clean water project in Zimbabwe in final stage - Csr Egypt","description":"A $ 33-million clean water and sanitation project in Zimbabwe will be finalized by the third quarter of 2020 to serve around 9,000 homes","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/","og_locale":"en_US","og_type":"article","og_title":"$33 m AfDB clean water project in Zimbabwe in final stage - Csr Egypt","og_description":"A $ 33-million clean water and sanitation project in Zimbabwe will be finalized by the third quarter of 2020 to serve around 9,000 homes","og_url":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/","og_site_name":"Csr Egypt","article_publisher":"https:\/\/www.facebook.com\/csregypt\/","article_published_time":"2020-03-16T07:56:23+00:00","og_image":[{"width":1200,"height":856,"url":"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg","type":"image\/jpeg"}],"author":"Marwa Zein","twitter_card":"summary_large_image","twitter_creator":"@egyptcsrforum","twitter_site":"@egyptcsrforum","twitter_misc":{"Written by":"Marwa Zein","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#article","isPartOf":{"@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/"},"author":{"name":"Marwa Zein","@id":"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec"},"headline":"$33 m AfDB clean water project in Zimbabwe in final stage","datePublished":"2020-03-16T07:56:23+00:00","dateModified":"2020-03-16T07:56:23+00:00","mainEntityOfPage":{"@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/"},"wordCount":454,"commentCount":0,"publisher":{"@id":"https:\/\/csregypt.com\/#organization"},"image":{"@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#primaryimage"},"thumbnailUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg","keywords":["#Clean Water","#Zimbabwe","AfDB","SDGs"],"articleSection":["news","Sustainable Development"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/","url":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/","name":"$33 m AfDB clean water project in Zimbabwe in final stage - Csr Egypt","isPartOf":{"@id":"https:\/\/csregypt.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#primaryimage"},"image":{"@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#primaryimage"},"thumbnailUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg","datePublished":"2020-03-16T07:56:23+00:00","dateModified":"2020-03-16T07:56:23+00:00","description":"A $ 33-million clean water and sanitation project in Zimbabwe will be finalized by the third quarter of 2020 to serve around 9,000 homes","breadcrumb":{"@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#primaryimage","url":"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg","contentUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg","width":1200,"height":856,"caption":"$33 m AfDB clean water project in Zimbabwe in final stage"},{"@type":"BreadcrumbList","@id":"https:\/\/csregypt.com\/en\/33-m-afdb-clean-water-project-in-zimbabwe-in-final-stage\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/csregypt.com\/"},{"@type":"ListItem","position":2,"name":"$33 m AfDB clean water project in Zimbabwe in final stage"}]},{"@type":"WebSite","@id":"https:\/\/csregypt.com\/#website","url":"https:\/\/csregypt.com\/","name":"\u0633\u064a \u0625\u0633 \u0622\u0631 \u0645\u0635\u0631","description":"The first portal for CSR in Egypt and Middle East","publisher":{"@id":"https:\/\/csregypt.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/csregypt.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/csregypt.com\/#organization","name":"CSR","url":"https:\/\/csregypt.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png","contentUrl":"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png","width":1080,"height":1080,"caption":"CSR"},"image":{"@id":"https:\/\/csregypt.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/csregypt\/","https:\/\/x.com\/egyptcsrforum","https:\/\/www.instagram.com\/csr.egypt\/","https:\/\/www.linkedin.com\/in\/csr-egypt-43381ab5\/","https:\/\/www.pinterest.com.au\/csregypt\/","https:\/\/www.youtube.com\/channel\/UCh21PZpnBj2yjj2PeclXz1g"]},{"@type":"Person","@id":"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec","name":"Marwa Zein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g","caption":"Marwa Zein"},"sameAs":["http:\/\/marwazein1982@gmail.com"],"url":"https:\/\/csregypt.com\/en\/author\/marwa-zein\/"}]}},"jetpack_featured_media_url":"https:\/\/csregypt.com\/wp-content\/uploads\/2020\/03\/ss-bwssip-3.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/53375"}],"collection":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/users\/410"}],"replies":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/comments?post=53375"}],"version-history":[{"count":1,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/53375\/revisions"}],"predecessor-version":[{"id":53378,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/53375\/revisions\/53378"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/media\/53376"}],"wp:attachment":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/media?parent=53375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/categories?post=53375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/tags?post=53375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}