{"id":123590,"date":"2026-11-18T19:25:33","date_gmt":"2026-11-18T17:25:33","guid":{"rendered":"https:\/\/csregypt.com\/?p=123590"},"modified":"2026-11-18T19:25:33","modified_gmt":"2026-11-18T17:25:33","slug":"ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations","status":"publish","type":"post","link":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/","title":{"rendered":"EBRD provides EGP 585 mln to Mesco for greener logistics operations"},"content":{"rendered":"<p dir=\"ltr\" style=\"text-align: left;\">The<a href=\"https:\/\/csregypt.com\/en\/ebrd-puts-100mln-behind-banque-du-caires-esg-digital-push\/\"> European Bank for Reconstruction and Development (EBRD<\/a>) is providing up to EGP 585 million (\u20ac10.6 million) to Egyptian logistics company Marine &amp; Engineering Services Company (Mesco) to expand its operations and support the transition towards greener, more energy-efficient logistics services.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">The financing will enable Mesco to expand its fleet of flatbed trucks and develop and extend logistics facilities in Alexandria, Port Said, Damietta and Sokhna. It will also cover machinery and equipment needed for the company&#8217;s logistics operations.<\/p>\n<h4 dir=\"ltr\" style=\"text-align: left;\">Greener logistics operations:<\/h4>\n<p dir=\"ltr\" style=\"text-align: left;\">The investment will support the introduction of electric equipment at Mesco&#8217;s logistics yards, helping the company gradually shift from diesel-powered operations to more energy-efficient, lower-emission alternatives.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">Alongside the loan, the EBRD will provide technical assistance to support Mesco&#8217;s transition to greener logistics. This will include a study to identify suitable routes for electric trucks, assess infrastructure and operational requirements, and establish a phased approach to fleet electrification.<\/p>\n<h4 dir=\"ltr\" style=\"text-align: left;\">Expanding logistics capacity:<\/h4>\n<p dir=\"ltr\" style=\"text-align: left;\">The expanded truck fleet and storage capacity are expected to reduce operational delays, improve the efficiency and resilience of Mesco&#8217;s logistics network, and support more reliable trade and supply chains.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">The EBRD will also provide advisory support to strengthen the company&#8217;s corporate governance practices in line with international standards, enhancing its institutional capacity and supporting its long-term growth.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">The project contributes to Egypt&#8217;s ambition to strengthen its position as a regional logistics hub through more efficient transport and logistics infrastructure.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">Established in 1983, Mesco provides transport, warehousing and port-related services.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">Egypt is a founding member of the EBRD. Since beginning operations in the country in 2012, the bank has invested almost \u20ac17 billion through 245 projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The European Bank for Reconstruction and Development (EBRD) is providing up to EGP 585 million (\u20ac10.6 million) to Egyptian logistics company Marine &amp; Engineering Services Company (Mesco) to expand its operations and support the transition towards greener, more energy-efficient logistics services. The financing will enable Mesco to expand its fleet of flatbed trucks and develop [&hellip;]<\/p>\n","protected":false},"author":410,"featured_media":123591,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"categories":[984,13332],"tags":[6087,23858,9965],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>EBRD provides EGP 585 mln to Mesco for greener logistics operations - Csr Egypt<\/title>\n<meta name=\"description\" content=\"EBRD is providing up to EGP 585 million to Mesco to support the transition towards greener, more energy-efficient logistics services.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EBRD provides EGP 585 mln to Mesco for greener logistics operations - Csr Egypt\" \/>\n<meta property=\"og:description\" content=\"EBRD is providing up to EGP 585 million to Mesco to support the transition towards greener, more energy-efficient logistics services.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/\" \/>\n<meta property=\"og:site_name\" content=\"Csr Egypt\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/csregypt\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-18T17:25:33+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1282\" \/>\n\t<meta property=\"og:image:height\" content=\"682\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Marwa Zein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@egyptcsrforum\" \/>\n<meta name=\"twitter:site\" content=\"@egyptcsrforum\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marwa Zein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/\"},\"author\":{\"name\":\"Marwa Zein\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec\"},\"headline\":\"EBRD provides EGP 585 mln to Mesco for greener logistics operations\",\"datePublished\":\"2026-11-18T17:25:33+00:00\",\"dateModified\":\"2026-11-18T17:25:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/\"},\"wordCount\":272,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/csregypt.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg\",\"keywords\":[\"#EBRD\",\"#Mesco\",\"green transition\"],\"articleSection\":[\"news\",\"The New Republic\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/\",\"url\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/\",\"name\":\"EBRD provides EGP 585 mln to Mesco for greener logistics operations - Csr Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/csregypt.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg\",\"datePublished\":\"2026-11-18T17:25:33+00:00\",\"dateModified\":\"2026-11-18T17:25:33+00:00\",\"description\":\"EBRD is providing up to EGP 585 million to Mesco to support the transition towards greener, more energy-efficient logistics services.\",\"breadcrumb\":{\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#primaryimage\",\"url\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg\",\"contentUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg\",\"width\":1282,\"height\":682,\"caption\":\"EBRD provides EGP 585 mln to Mesco for greener logistics operations\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/csregypt.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EBRD provides EGP 585 mln to Mesco for greener logistics operations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/csregypt.com\/#website\",\"url\":\"https:\/\/csregypt.com\/\",\"name\":\"\u0633\u064a \u0625\u0633 \u0622\u0631 \u0645\u0635\u0631\",\"description\":\"The first portal for CSR in Egypt and Middle East\",\"publisher\":{\"@id\":\"https:\/\/csregypt.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/csregypt.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/csregypt.com\/#organization\",\"name\":\"CSR\",\"url\":\"https:\/\/csregypt.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png\",\"contentUrl\":\"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png\",\"width\":1080,\"height\":1080,\"caption\":\"CSR\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/csregypt\/\",\"https:\/\/x.com\/egyptcsrforum\",\"https:\/\/www.instagram.com\/csr.egypt\/\",\"https:\/\/www.linkedin.com\/in\/csr-egypt-43381ab5\/\",\"https:\/\/www.pinterest.com.au\/csregypt\/\",\"https:\/\/www.youtube.com\/channel\/UCh21PZpnBj2yjj2PeclXz1g\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec\",\"name\":\"Marwa Zein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g\",\"caption\":\"Marwa Zein\"},\"sameAs\":[\"http:\/\/marwazein1982@gmail.com\"],\"url\":\"https:\/\/csregypt.com\/en\/author\/marwa-zein\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EBRD provides EGP 585 mln to Mesco for greener logistics operations - Csr Egypt","description":"EBRD is providing up to EGP 585 million to Mesco to support the transition towards greener, more energy-efficient logistics services.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/","og_locale":"en_US","og_type":"article","og_title":"EBRD provides EGP 585 mln to Mesco for greener logistics operations - Csr Egypt","og_description":"EBRD is providing up to EGP 585 million to Mesco to support the transition towards greener, more energy-efficient logistics services.","og_url":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/","og_site_name":"Csr Egypt","article_publisher":"https:\/\/www.facebook.com\/csregypt\/","article_published_time":"2026-11-18T17:25:33+00:00","og_image":[{"width":1282,"height":682,"url":"http:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg","type":"image\/jpeg"}],"author":"Marwa Zein","twitter_card":"summary_large_image","twitter_creator":"@egyptcsrforum","twitter_site":"@egyptcsrforum","twitter_misc":{"Written by":"Marwa Zein","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#article","isPartOf":{"@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/"},"author":{"name":"Marwa Zein","@id":"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec"},"headline":"EBRD provides EGP 585 mln to Mesco for greener logistics operations","datePublished":"2026-11-18T17:25:33+00:00","dateModified":"2026-11-18T17:25:33+00:00","mainEntityOfPage":{"@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/"},"wordCount":272,"commentCount":0,"publisher":{"@id":"https:\/\/csregypt.com\/#organization"},"image":{"@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#primaryimage"},"thumbnailUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg","keywords":["#EBRD","#Mesco","green transition"],"articleSection":["news","The New Republic"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/","url":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/","name":"EBRD provides EGP 585 mln to Mesco for greener logistics operations - Csr Egypt","isPartOf":{"@id":"https:\/\/csregypt.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#primaryimage"},"image":{"@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#primaryimage"},"thumbnailUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg","datePublished":"2026-11-18T17:25:33+00:00","dateModified":"2026-11-18T17:25:33+00:00","description":"EBRD is providing up to EGP 585 million to Mesco to support the transition towards greener, more energy-efficient logistics services.","breadcrumb":{"@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#primaryimage","url":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg","contentUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg","width":1282,"height":682,"caption":"EBRD provides EGP 585 mln to Mesco for greener logistics operations"},{"@type":"BreadcrumbList","@id":"https:\/\/csregypt.com\/en\/ebrd-provides-egp-585-mln-to-mesco-for-greener-logistics-operations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/csregypt.com\/"},{"@type":"ListItem","position":2,"name":"EBRD provides EGP 585 mln to Mesco for greener logistics operations"}]},{"@type":"WebSite","@id":"https:\/\/csregypt.com\/#website","url":"https:\/\/csregypt.com\/","name":"\u0633\u064a \u0625\u0633 \u0622\u0631 \u0645\u0635\u0631","description":"The first portal for CSR in Egypt and Middle East","publisher":{"@id":"https:\/\/csregypt.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/csregypt.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/csregypt.com\/#organization","name":"CSR","url":"https:\/\/csregypt.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png","contentUrl":"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png","width":1080,"height":1080,"caption":"CSR"},"image":{"@id":"https:\/\/csregypt.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/csregypt\/","https:\/\/x.com\/egyptcsrforum","https:\/\/www.instagram.com\/csr.egypt\/","https:\/\/www.linkedin.com\/in\/csr-egypt-43381ab5\/","https:\/\/www.pinterest.com.au\/csregypt\/","https:\/\/www.youtube.com\/channel\/UCh21PZpnBj2yjj2PeclXz1g"]},{"@type":"Person","@id":"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec","name":"Marwa Zein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g","caption":"Marwa Zein"},"sameAs":["http:\/\/marwazein1982@gmail.com"],"url":"https:\/\/csregypt.com\/en\/author\/marwa-zein\/"}]}},"jetpack_featured_media_url":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/11\/Mesco.jpg","_links":{"self":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/123590"}],"collection":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/users\/410"}],"replies":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/comments?post=123590"}],"version-history":[{"count":1,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/123590\/revisions"}],"predecessor-version":[{"id":123593,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/123590\/revisions\/123593"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/media\/123591"}],"wp:attachment":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/media?parent=123590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/categories?post=123590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/tags?post=123590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}