{"id":121147,"date":"2026-10-07T12:06:10","date_gmt":"2026-10-07T09:06:10","guid":{"rendered":"https:\/\/csregypt.com\/?p=121147"},"modified":"2026-10-07T12:06:10","modified_gmt":"2026-10-07T09:06:10","slug":"rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2","status":"publish","type":"post","link":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/","title":{"rendered":"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2"},"content":{"rendered":"<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">Rezolv Energy, backed by Actis and <a href=\"https:\/\/www.mubadala.com\/en\">Mubadala<\/a>, has energized the 192-megawatt (MW) first phase of the VIFOR Wind Farm in Romania\u2019s Buz\u0103u County, the country\u2019s largest wind project to be energized in more than a decade.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">The second phase, due for completion in 2027, will bring VIFOR\u2019s total capacity to 461MW, making it one of Europe\u2019s highest-capacity onshore wind farms.<\/p>\n<h3 dir=\"ltr\" style=\"text-align: left;\">192MW first phase:<\/h3>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">VIFOR Phase 1 comprises 30 Vestas V162 turbines, each with a capacity of 6.4MW. Vestas served as the engineering, procurement and construction (EPC) partner for the phase.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">Once fully operational, VIFOR is expected to generate enough electricity to power more than 270,000 homes and avoid approximately 540,000 tons of CO\u2082e emissions annually.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">The project follows the opening in May 2026 of Rezolv Energy\u2019s 225MW St. George solar park in Silistra, Bulgaria, its first project to come onstream.<\/p>\n<h3 dir=\"ltr\" style=\"text-align: left;\">Boosting Romania\u2019s wind capacity:<\/h3>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">The project comes as Romania seeks to revive large-scale wind development after rapid capacity growth between 2010 and 2015 was followed by a period of slower expansion.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">Romania currently has just over 3GW of installed wind capacity, while its National Energy and Climate Plan targets 7.3GW by 2030.<\/p>\n<h3 dir=\"ltr\" style=\"text-align: left;\">\u20ac291mln phase 1 financing:<\/h3>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">VIFOR Phase 1 was supported by up to \u20ac291 million in financing from a consortium of eight lenders led by Erste Group, UniCredit Group and the<a href=\"https:\/\/csregypt.com\/en\/ebrd-co-finances-e561-mln-europes-largest-solar-plant\/\"> European Bank for Reconstruction and Development (EBRD).<\/a><\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">Phase 2 is backed by additional financing facilities of up to \u20ac331 million, largely provided by lenders involved in Phase 1.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">The project is also supported by six long-term corporate power purchase agreements (PPAs) with T-Mobile Czech Republic, Slovak Telekom, CE Colo Czech Republic, Bekaert, A2A and Etem Gestamp, representing more than 350 gigawatt-hours (GWh) of clean power annually.<\/p>\n<h3 dir=\"ltr\" style=\"text-align: left;\">Skills, biodiversity:<\/h3>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">Rezolv Energy and RenewAcad opened a renewable energy training center in Buz\u0103u in 2025. Through its Rezolv Energy Skills Academy, the company has provided 200 free training places to support local renewable energy skills development.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">The project also includes biodiversity measures covering two Natura 2000 areas, with dedicated management and action plans for mitigation, monitoring and restoration, including bird and bat monitoring.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\" style=\"text-align: left;\">Rezolv Energy has a 2.8GW portfolio of large-scale renewable energy projects in operation, construction or late-stage development across Southeastern Europe.<\/p>\n<p dir=\"ltr\" style=\"text-align: left;\">Its Romanian portfolio includes the 1.3GW Dama Solar project in Arad County and the 600MW Dunarea East &amp; West Wind Farms in Constan\u021ba County.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rezolv Energy, backed by Actis and Mubadala, has energized the 192-megawatt (MW) first phase of the VIFOR Wind Farm in Romania\u2019s Buz\u0103u County, the country\u2019s largest wind project to be energized in more than a decade. The second phase, due for completion in 2027, will bring VIFOR\u2019s total capacity to 461MW, making it one of [&hellip;]<\/p>\n","protected":false},"author":410,"featured_media":121148,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"categories":[13331,984],"tags":[6087,22637,7821],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2 - Csr Egypt<\/title>\n<meta name=\"description\" content=\"Rezolv Energy has energized the 192-megawatt (MW) first phase of the VIFOR Wind Farm in Romania, the country\u2019s largest wind project to be energized in over a decade.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2 - Csr Egypt\" \/>\n<meta property=\"og:description\" content=\"Rezolv Energy has energized the 192-megawatt (MW) first phase of the VIFOR Wind Farm in Romania, the country\u2019s largest wind project to be energized in over a decade.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Csr Egypt\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/csregypt\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-07T09:06:10+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"888\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Marwa Zein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@egyptcsrforum\" \/>\n<meta name=\"twitter:site\" content=\"@egyptcsrforum\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marwa Zein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/\"},\"author\":{\"name\":\"Marwa Zein\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec\"},\"headline\":\"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2\",\"datePublished\":\"2026-10-07T09:06:10+00:00\",\"dateModified\":\"2026-10-07T09:06:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/\"},\"wordCount\":399,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/csregypt.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg\",\"keywords\":[\"#EBRD\",\"#Romania\",\"#Wind Farm\"],\"articleSection\":[\"Knowledge Bank\",\"news\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/\",\"url\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/\",\"name\":\"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2 - Csr Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/csregypt.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg\",\"datePublished\":\"2026-10-07T09:06:10+00:00\",\"dateModified\":\"2026-10-07T09:06:10+00:00\",\"description\":\"Rezolv Energy has energized the 192-megawatt (MW) first phase of the VIFOR Wind Farm in Romania, the country\u2019s largest wind project to be energized in over a decade.\",\"breadcrumb\":{\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#primaryimage\",\"url\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg\",\"contentUrl\":\"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg\",\"width\":2048,\"height\":888,\"caption\":\"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/csregypt.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/csregypt.com\/#website\",\"url\":\"https:\/\/csregypt.com\/\",\"name\":\"\u0633\u064a \u0625\u0633 \u0622\u0631 \u0645\u0635\u0631\",\"description\":\"The first portal for CSR in Egypt and Middle East\",\"publisher\":{\"@id\":\"https:\/\/csregypt.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/csregypt.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/csregypt.com\/#organization\",\"name\":\"CSR\",\"url\":\"https:\/\/csregypt.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png\",\"contentUrl\":\"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png\",\"width\":1080,\"height\":1080,\"caption\":\"CSR\"},\"image\":{\"@id\":\"https:\/\/csregypt.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/csregypt\/\",\"https:\/\/x.com\/egyptcsrforum\",\"https:\/\/www.instagram.com\/csr.egypt\/\",\"https:\/\/www.linkedin.com\/in\/csr-egypt-43381ab5\/\",\"https:\/\/www.pinterest.com.au\/csregypt\/\",\"https:\/\/www.youtube.com\/channel\/UCh21PZpnBj2yjj2PeclXz1g\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec\",\"name\":\"Marwa Zein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/csregypt.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g\",\"caption\":\"Marwa Zein\"},\"sameAs\":[\"http:\/\/marwazein1982@gmail.com\"],\"url\":\"https:\/\/csregypt.com\/en\/author\/marwa-zein\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2 - Csr Egypt","description":"Rezolv Energy has energized the 192-megawatt (MW) first phase of the VIFOR Wind Farm in Romania, the country\u2019s largest wind project to be energized in over a decade.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/","og_locale":"en_US","og_type":"article","og_title":"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2 - Csr Egypt","og_description":"Rezolv Energy has energized the 192-megawatt (MW) first phase of the VIFOR Wind Farm in Romania, the country\u2019s largest wind project to be energized in over a decade.","og_url":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/","og_site_name":"Csr Egypt","article_publisher":"https:\/\/www.facebook.com\/csregypt\/","article_published_time":"2026-10-07T09:06:10+00:00","og_image":[{"width":2048,"height":888,"url":"http:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg","type":"image\/jpeg"}],"author":"Marwa Zein","twitter_card":"summary_large_image","twitter_creator":"@egyptcsrforum","twitter_site":"@egyptcsrforum","twitter_misc":{"Written by":"Marwa Zein","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#article","isPartOf":{"@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/"},"author":{"name":"Marwa Zein","@id":"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec"},"headline":"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2","datePublished":"2026-10-07T09:06:10+00:00","dateModified":"2026-10-07T09:06:10+00:00","mainEntityOfPage":{"@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/"},"wordCount":399,"commentCount":0,"publisher":{"@id":"https:\/\/csregypt.com\/#organization"},"image":{"@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#primaryimage"},"thumbnailUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg","keywords":["#EBRD","#Romania","#Wind Farm"],"articleSection":["Knowledge Bank","news"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/","url":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/","name":"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2 - Csr Egypt","isPartOf":{"@id":"https:\/\/csregypt.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#primaryimage"},"image":{"@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#primaryimage"},"thumbnailUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg","datePublished":"2026-10-07T09:06:10+00:00","dateModified":"2026-10-07T09:06:10+00:00","description":"Rezolv Energy has energized the 192-megawatt (MW) first phase of the VIFOR Wind Farm in Romania, the country\u2019s largest wind project to be energized in over a decade.","breadcrumb":{"@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#primaryimage","url":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg","contentUrl":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg","width":2048,"height":888,"caption":"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2"},{"@type":"BreadcrumbList","@id":"https:\/\/csregypt.com\/en\/rezolv-energizes-romanias-largest-wind-farm-at-192mw-e331m-phase-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/csregypt.com\/"},{"@type":"ListItem","position":2,"name":"Rezolv Energizes Romania\u2019s largest wind farm at 192MW, \u20ac331m phase 2"}]},{"@type":"WebSite","@id":"https:\/\/csregypt.com\/#website","url":"https:\/\/csregypt.com\/","name":"\u0633\u064a \u0625\u0633 \u0622\u0631 \u0645\u0635\u0631","description":"The first portal for CSR in Egypt and Middle East","publisher":{"@id":"https:\/\/csregypt.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/csregypt.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/csregypt.com\/#organization","name":"CSR","url":"https:\/\/csregypt.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png","contentUrl":"https:\/\/www.csregypt.com\/wp-content\/uploads\/2019\/05\/logos-7.png","width":1080,"height":1080,"caption":"CSR"},"image":{"@id":"https:\/\/csregypt.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/csregypt\/","https:\/\/x.com\/egyptcsrforum","https:\/\/www.instagram.com\/csr.egypt\/","https:\/\/www.linkedin.com\/in\/csr-egypt-43381ab5\/","https:\/\/www.pinterest.com.au\/csregypt\/","https:\/\/www.youtube.com\/channel\/UCh21PZpnBj2yjj2PeclXz1g"]},{"@type":"Person","@id":"https:\/\/csregypt.com\/#\/schema\/person\/5df2c73ec5c5eaada424a85f98cd7bec","name":"Marwa Zein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/csregypt.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/383ed3b7c60ec18a972e284b402d1b29?s=96&d=mm&r=g","caption":"Marwa Zein"},"sameAs":["http:\/\/marwazein1982@gmail.com"],"url":"https:\/\/csregypt.com\/en\/author\/marwa-zein\/"}]}},"jetpack_featured_media_url":"https:\/\/csregypt.com\/wp-content\/uploads\/2026\/10\/Rezolv.jpg","_links":{"self":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/121147"}],"collection":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/users\/410"}],"replies":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/comments?post=121147"}],"version-history":[{"count":1,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/121147\/revisions"}],"predecessor-version":[{"id":121150,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/posts\/121147\/revisions\/121150"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/media\/121148"}],"wp:attachment":[{"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/media?parent=121147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/categories?post=121147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csregypt.com\/en\/wp-json\/wp\/v2\/tags?post=121147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}